Continuous Sampling Calculator

Switching Between Screening and Sampling according to CSP-1

Switching from Screening (100% inspection) to sampling (partial inspection)
Enter your sampling plan:
Clearance Number (i): The number of consecutive conforming items that is required for switching to sampling (i)
Sampling fraction (f): The probability of inspecting an item during sampling inspection (f)
Probability of non-conforming item (p): The proability that an item is non-conforming
Maximum number of items: How far (or how many items) into the future do you want to learn about?

Don't have a CSP-1 sampling plan? Get one first (and then return to this page)