This page is designed to give a probability plot of the time to signaling an alarm (the run-length), for a Shewhart control chart with or without supplementary run rules.
Online Statistical Calculators for Acceptance Sampling and Quality Control
This page is designed to give a probability plot of the time to signaling an alarm (the run-length), for a Shewhart control chart with or without supplementary run rules.
If we deliver on time, but the product has defects, we have not delivered on time.
Philip Crosby