The purpose of using a control chart is to detect a shift in the process mean, of a specific size. To detect a shift of two standard-deviations-of-the mean, enter the value 2.
All things will be produced in superior quantity and quality, and with greater ease, when each man works at a single occupation, in accordance with his natural gifts, and at the right moment, without meddling with anything else.